Difference between revisions of "Integrating Climate Change into the ICZM planning process - Setting the Vision"
From Coastal Wiki
Line 12: | Line 12: | ||
rect 372 2396 1780 2896[[CC ICZM Process/Realizing_the_Vision]] | rect 372 2396 1780 2896[[CC ICZM Process/Realizing_the_Vision]] | ||
</imagemap> | </imagemap> | ||
+ | |||
+ | __TOC__ | ||
+ | |||
+ | The aim of this stage is to engage the stakeholders in setting the priorities and agreeing on the | ||
+ | key policies and measures that should be considered in the analysis stage. | ||
+ | |||
+ | ==Building consensus== | ||
+ | |||
+ | The point of departure for this stage is the scoping report, which was prepared at the establishment stage and which identified the drivers and pressures and risks associated with the different areas of concern. This report is discussed with stakeholders and amended in the light of their reactions. In addition the stakeholder consultations are used to determine the | ||
+ | priorities. | ||
+ | In the area of climate change priorities will have to drawn from a range of possible actions. These can be classified as follows: |
Revision as of 18:12, 30 October 2013
Introduction |
|
Establishment |
|
Analysis and Futures |
|
Setting the Vision |
|
Designing the Future |
|
Realising the Vision |
|
Contents
The aim of this stage is to engage the stakeholders in setting the priorities and agreeing on the key policies and measures that should be considered in the analysis stage.
Building consensus
The point of departure for this stage is the scoping report, which was prepared at the establishment stage and which identified the drivers and pressures and risks associated with the different areas of concern. This report is discussed with stakeholders and amended in the light of their reactions. In addition the stakeholder consultations are used to determine the priorities. In the area of climate change priorities will have to drawn from a range of possible actions. These can be classified as follows: