Difference between revisions of "The ICZM Process - a Roadmap towards Coastal Sustainability - Realising the Vision"

From Coastal Wiki
Jump to: navigation, search
 
(25 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
{{ICZM Process diagram/TabsHeader|This=6}}
 
{{ICZM Process diagram/TabsHeader|This=6}}
 +
__TOC__
 +
<imagemap>
 +
Image:ICZM pegaso 3 6.png|right|300px
 +
rect 368 20 1788 504[[ICZM_Process_diagram/Establishment]]
 +
rect 372 604 1780 1100[[ICZM_Process_diagram/Analysis_and_Future]]
 +
rect 372 1200 1772 1696[[ICZM_Process_diagram/Setting_the_vision]]
 +
rect 372 1800 1776 2300[[ICZM_Process_diagram/Designing_the_Future]]
 +
rect 372 2396 1780 2896[[ICZM_Process_diagram/Realizing_the_Vision]]
 +
</imagemap>
 +
This is the critical stage in the Process where policy design shifts to the facilitation of change. ICZM strategies, plans or programmes for coastal areas will deploy a combination of policy instruments, management processes and actions.  The strength of ICZM is its flexibility, adaptability to local circumstances, and operability across a range of sectors and issues, and with a representative governance structure. 
  
[[Image:ICZM pegaso 5.png|right|300px]]
+
== Key tasks ==
Lorem ipsum dolor
+
 
sit amet, consectetur adipiscing elit. Fusce dapibus laoreet
+
# '''Implementation''' – implementing legal, economic and spatial instruments and management process.
est a interdum. Aliquam vulputate, nisl eget semper laoreet,
+
# '''Actions''' – awareness raising, partnerships, financing and investment.
ligula nibh commodo risus, sit amet ullamcorper metus
+
# '''Monitoring and Review''' - constant feedback into the review of the strategy, plan or programme and its action plan.
mauris vitae leo. Aliquam erat volutpat. Nunc sit amet ante
+
 
sed quam facilisis tempor. Aenean nec orci nisl, at auctor
+
The implementation programme should have a clear work plan, be embedded into supporting funding programmes, achieving maximum “gearing” through multiple sponsors. '''The ICZM Steering Group and implementation team, or those bodies charged with delivery, should be in place and functional.'''
massa. Donec malesuada pellentesque erat sit amet
+
 
consequat. Sed arcu urna, luctus sit amet pellentesque quis,
+
Outputs and their subsequent outcomes should now be visible and, where possible, monitored as part of the monitoring and review process. Raising and maintaining public awareness will be an ongoing activity.
consectetur a turpis. Curabitur suscipit orci bibendum urna
+
 
pellentesque interdum. Ut nulla lorem, placerat id sollicitudin
+
== Potential Outputs ==
id, malesuada non arcu.
+
! Aliquam vulputate dolor ac turpis viverra eu aliquet
+
A '''review''' on an agreed timescale. This may include proposal for a feedback to the process in the form of a revision, if deemed necessary.
sem egestas. Vestibulum accumsan est non neque
+
 
elementum vel faucibus mi eleifend.
+
The cross-sectoral '''management or steering group''' with Terms of Reference and clear lines of responsibility and reporting.
! Sed convallis aliquet justo sagittis molestie. Cras
+
 
fringilla libero in justo aliquam eu placerat felis mollis.
+
'''Outputs''' as defined in the programme of implementation or its review.
! Etiam et cursus tellus. Nunc sapien nulla, dignissim
+
 
ac tempus sed, dignissim eu nisi.
+
== See Also==
 +
 
 +
* [[Integrating_Climate_Change_into_the_ICZM_planning_process_-_Realising_the_Vision|The Realising the Vision phase when Integrating Climate Change into the ICZM planning process]]
 +
 
 +
 
 +
{{Template:PAP/RAC}}
 +
<div style="text-align: right; direction: ltr; margin-left: 1em;">
 +
Return to: [[ICZM_Process_diagram/Establishment|Establishment]]
 +
</div>
 +
 
 +
[[Category:The ICZM Process]]
 +
[[Category:ICZM methodology (PEGASO)]]

Latest revision as of 11:00, 25 July 2020


Introduction  


Establishment  


Analysis and Futures  


Setting the Vision  


Designing the Future  


Realising the Vision  


 


ICZM Process diagram/EstablishmentICZM Process diagram/Analysis and FutureICZM Process diagram/Setting the visionICZM Process diagram/Designing the FutureICZM Process diagram/Realizing the VisionICZM pegaso 3 6.png
About this image

This is the critical stage in the Process where policy design shifts to the facilitation of change. ICZM strategies, plans or programmes for coastal areas will deploy a combination of policy instruments, management processes and actions. The strength of ICZM is its flexibility, adaptability to local circumstances, and operability across a range of sectors and issues, and with a representative governance structure.

Key tasks

  1. Implementation – implementing legal, economic and spatial instruments and management process.
  2. Actions – awareness raising, partnerships, financing and investment.
  3. Monitoring and Review - constant feedback into the review of the strategy, plan or programme and its action plan.

The implementation programme should have a clear work plan, be embedded into supporting funding programmes, achieving maximum “gearing” through multiple sponsors. The ICZM Steering Group and implementation team, or those bodies charged with delivery, should be in place and functional.

Outputs and their subsequent outcomes should now be visible and, where possible, monitored as part of the monitoring and review process. Raising and maintaining public awareness will be an ongoing activity.

Potential Outputs

A review on an agreed timescale. This may include proposal for a feedback to the process in the form of a revision, if deemed necessary.

The cross-sectoral management or steering group with Terms of Reference and clear lines of responsibility and reporting.

Outputs as defined in the programme of implementation or its review.

See Also


This article has been drafted by PAP/RAC
Please note that others may also have edited the contents of this article.

Return to: Establishment