Difference between revisions of "The ICZM Process - a Roadmap towards Coastal Sustainability - Realising the Vision"

From Coastal Wiki
Jump to: navigation, search
 
(24 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
{{ICZM Process diagram/TabsHeader|This=6}}
 
{{ICZM Process diagram/TabsHeader|This=6}}
 +
__TOC__
 
<imagemap>
 
<imagemap>
Image:ICZM pegaso 5.png|right|300px
+
Image:ICZM pegaso 3 6.png|right|300px
rect 90 3 445 123[[ICZM_Process_diagram/Establishment]]
+
rect 368 20 1788 504[[ICZM_Process_diagram/Establishment]]
rect 91 149 443 273[[ICZM_Process_diagram/Setting_the_vision]]
+
rect 372 604 1780 1100[[ICZM_Process_diagram/Analysis_and_Future]]
rect 90 299 444 425[[ICZM_Process_diagram/Analysis_and_Future]]
+
rect 372 1200 1772 1696[[ICZM_Process_diagram/Setting_the_vision]]
rect 90 452 445 576[[ICZM_Process_diagram/Designing_the_Future]]
+
rect 372 1800 1776 2300[[ICZM_Process_diagram/Designing_the_Future]]
rect 89 601 445 722[[ICZM_Process_diagram/Realizing_the_Vision]]
+
rect 372 2396 1780 2896[[ICZM_Process_diagram/Realizing_the_Vision]]
 
</imagemap>
 
</imagemap>
Lorem ipsum dolor
+
This is the critical stage in the Process where policy design shifts to the facilitation of change. ICZM strategies, plans or programmes for coastal areas will deploy a combination of policy instruments, management processes and actions. The strength of ICZM is its flexibility, adaptability to local circumstances, and operability across a range of sectors and issues, and with a representative governance structure. 
sit amet, consectetur adipiscing elit. Fusce dapibus laoreet
+
 
est a interdum. Aliquam vulputate, nisl eget semper laoreet,
+
== Key tasks ==
ligula nibh commodo risus, sit amet ullamcorper metus
+
 
mauris vitae leo. Aliquam erat volutpat. Nunc sit amet ante
+
# '''Implementation''' – implementing legal, economic and spatial instruments and management process.
sed quam facilisis tempor. Aenean nec orci nisl, at auctor
+
# '''Actions''' – awareness raising, partnerships, financing and investment.
massa. Donec malesuada pellentesque erat sit amet
+
# '''Monitoring and Review''' - constant feedback into the review of the strategy, plan or programme and its action plan.
consequat. Sed arcu urna, luctus sit amet pellentesque quis,
+
 
consectetur a turpis. Curabitur suscipit orci bibendum urna
+
The implementation programme should have a clear work plan, be embedded into supporting funding programmes, achieving maximum “gearing” through multiple sponsors. '''The ICZM Steering Group and implementation team, or those bodies charged with delivery, should be in place and functional.'''
pellentesque interdum. Ut nulla lorem, placerat id sollicitudin
+
 
id, malesuada non arcu.
+
Outputs and their subsequent outcomes should now be visible and, where possible, monitored as part of the monitoring and review process. Raising and maintaining public awareness will be an ongoing activity.
! Aliquam vulputate dolor ac turpis viverra eu aliquet
+
 
sem egestas. Vestibulum accumsan est non neque
+
== Potential Outputs ==
elementum vel faucibus mi eleifend.
+
! Sed convallis aliquet justo sagittis molestie. Cras
+
A '''review''' on an agreed timescale. This may include proposal for a feedback to the process in the form of a revision, if deemed necessary.
fringilla libero in justo aliquam eu placerat felis mollis.
+
 
! Etiam et cursus tellus. Nunc sapien nulla, dignissim
+
The cross-sectoral '''management or steering group''' with Terms of Reference and clear lines of responsibility and reporting.
ac tempus sed, dignissim eu nisi.
+
 
 +
'''Outputs''' as defined in the programme of implementation or its review.
 +
 
 +
== See Also==
 +
 
 +
* [[Integrating_Climate_Change_into_the_ICZM_planning_process_-_Realising_the_Vision|The Realising the Vision phase when Integrating Climate Change into the ICZM planning process]]
 +
 
 +
 
 +
{{Template:PAP/RAC}}
 +
<div style="text-align: right; direction: ltr; margin-left: 1em;">
 +
Return to: [[ICZM_Process_diagram/Establishment|Establishment]]
 +
</div>
 +
 
 +
[[Category:The ICZM Process]]
 +
[[Category:ICZM methodology (PEGASO)]]

Latest revision as of 11:00, 25 July 2020


Introduction  


Establishment  


Analysis and Futures  


Setting the Vision  


Designing the Future  


Realising the Vision  


 


ICZM Process diagram/EstablishmentICZM Process diagram/Analysis and FutureICZM Process diagram/Setting the visionICZM Process diagram/Designing the FutureICZM Process diagram/Realizing the VisionICZM pegaso 3 6.png
About this image

This is the critical stage in the Process where policy design shifts to the facilitation of change. ICZM strategies, plans or programmes for coastal areas will deploy a combination of policy instruments, management processes and actions. The strength of ICZM is its flexibility, adaptability to local circumstances, and operability across a range of sectors and issues, and with a representative governance structure.

Key tasks

  1. Implementation – implementing legal, economic and spatial instruments and management process.
  2. Actions – awareness raising, partnerships, financing and investment.
  3. Monitoring and Review - constant feedback into the review of the strategy, plan or programme and its action plan.

The implementation programme should have a clear work plan, be embedded into supporting funding programmes, achieving maximum “gearing” through multiple sponsors. The ICZM Steering Group and implementation team, or those bodies charged with delivery, should be in place and functional.

Outputs and their subsequent outcomes should now be visible and, where possible, monitored as part of the monitoring and review process. Raising and maintaining public awareness will be an ongoing activity.

Potential Outputs

A review on an agreed timescale. This may include proposal for a feedback to the process in the form of a revision, if deemed necessary.

The cross-sectoral management or steering group with Terms of Reference and clear lines of responsibility and reporting.

Outputs as defined in the programme of implementation or its review.

See Also


This article has been drafted by PAP/RAC
Please note that others may also have edited the contents of this article.

Return to: Establishment